Jiaobo Announcement:
Location : Home > News > Company News

Ground-level blasting construction test for Chenggao high-speed rail line

Time:2019-01-04 Views:
       In December 2018, the coordinates of the newly built Yibin West Station, the blasting operation unit will be buried in the construction site near the Chengdu-Guizhou high-speed railway line for the blasting and dangerous operation of the flat field, and will be entrusted by Chengdu Railway Bureau and Chengtou Company. Vibration monitoring points and strain observation points are arranged on the high-speed rail line for testing tasks. Since the installation and layout of the measuring points were notified only one day before the blasting, and the high-speed railway station is currently in the joint adjustment stage, it needs to be operated within a short period of the skylight point. The professionals of our company have accumulated a lot of practical experience from various monitoring projects for many years, and successfully completed the monitoring task in the short time and urgent task, and won the praise of the entrusting unit.