Jiaobo Announcement:
Location : Home > Case > Monitoring Service
Vibration Monitoring of Blasting Construction in Dam of Energy Dissipation Dam of Gaixiaba Hydropower Station
 
In April 2012, under the entrustment of Zhongshui Northeast Survey and Design Research Co., Ltd., our company undertook the vibration monitoring of blasting construction of the dam energy dissipation pond of Yunyang Gaixiaoba Hydropower Station, mainly through small-scale blasting experiments, collecting vibration data and obtaining The topographic geological conditions and attenuation index, so as to obtain the safe distance from the explosion zone to the protection, provide a basis for the later blasting construction.

​ 

​